MIL-DTL-25308C
4.4.2.1 Sampling plan A. One gage shall be selected at random from each 100 or less produced
on the contract or order and subjected to the following tests as described under 4.5:
a.
Individual tests.
b.
Vibration.
c.
Low temperature operation.
d.
High temperature operation.
4.4.2.2 Sampling plan B. Unless otherwise specified, three gages shall be selected at random
from the first 15 produced on the contract or order and subjected to the following tests as
described under 4.X:
a.
Sampling plan A tests.
b.
Seasoning.
c.
Temperature-altitude.
d.
Low temperature exposure.
e.
High temperature exposure.
f.
Humidity.
g.
Salt fog.
h.
Fungus.
i.
Dust.
j.
Overpressure.
4.4.2.3 Rejection and retest. When one gage selected from a production run fails to meet the
requirements of this specification, no gages on hand or later produced shall be accepted until the
extent and cause of failure have been determined.
4.4.2.3.1 Continuation of individual tests. For operational reasons, individual tests may
continue pending the investigation of a sampling test failure. Final acceptance of gages on hand
or later produced shall not be made until it is determined that gages meet all the requirements of
this specification.
4.4.3 Defects in items already accepted. The investigation of a test failure could indicate that
defects may exist in gages already accepted. If so, the contractor shall fully advise the procuring
activity of all defects likely to be found and methods of correcting them.
4.5 Test methods.
4.5.1 Examination of product. The gage shall be examined to determine compliance with
requirements specified herein with respect to materials, markings, dimensions and workmanship.