MIL-DTL-6508C
3.12.1 Envelope. An envelope, furnished by the contractor and containing installation
instructions, shall be packaged with each thermometer and shall be marked with the following
information:
IMPORTANT
THIS ENVELOPE CONTAINS
INSTALLATION INSTRUCTIONS
3.13 Recycled, recovered, or environmentally preferable materials. Recycled, recovered,
or environmentally preferable materials should be used to the maximum extent possible,
provided that the material meets or exceeds the operational and maintenance requirements, and
promotes economically advantageous life cycle costs.
4. VERIFICATION
4.1 Classification of inspections. The inspection requirements specified herein are
classified as follows:
a. First article inspection (see 4.2).
b. Conformance inspection (see 4.3).
4.2 First article inspection. First article inspection shall consist of all the inspections and
tests of this specification performed in the order specified in table I.
TABLE I. First article and conformance inspections.
Inspections and tests
First article inspection
Conformance inspection
Paragraph
Inspection
X
Individual test
4.5.1
Scale error
X
Individual test
4.5.2
Position error
X
Individual test
4.5.3
Drift
X
Sampling test
4.5.4
Durability
X
Sampling test
4.5.5
Response time (lag)
X
Sampling test
4.5.6
Sealing
X
Sampling test
4.5.7
Vibration
X
Sampling test
4.5.8
Altitude
X
-
4.5.9
Thermal conductivity
X
-
4.5.10
Vibration endurance
X
-
4.5.11
Detail examination
X
-
4.5.12
8
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business